Access Bridge

Spring Creek Dam

The Intake Tower at Spring Creek Dam required an access bridge; a Structural Steel design was proposed, fabricated and installed by Donnely Mining & Civil.

The Bridge is 36m long and is supported on one end by a Concrete Footing at the dam wall and supported at the other end on an 11m high Structural Steel Column adjacent to the Intake Tower.

The total structure was assembled and installed in 4 hours by six men and 2 cranes.