Dam Spilway
Spring Creek Dam
The Spillway at Spring Creek Dam was upgraded to accomodate potentially higher flood levels. The work consisted primarily of:- Earthworks to expose competent rock; pressure washing & preparing the rock surfaces for concrete foundations.
- Pouring concrete foundations, up to 130cum, to ground level.
- Formwork, Steel Fixing and Concrete pouring of the Retaining Walls either side of the existing Spillway; walls up to 5m high and 600mm thick.
- Approx 1300 cum concrete poured in the two retaining wall structures.